| 2008 |
CVD in at the deep end
Aberfoyle swimming pool demolition to form new shape pool, with jacuzzi area. more>> |
 |
| |
| 2007 |
Morrison - Irvine
Double simultaneous wire saw cuts to a live steel sewage pipe to enable diversion onto a new facility without disruption to services. CVD are now back onsite to perform another 2 similar operations. more>> |
 |
Paintstripping - Glasgow
Removal of paint from a pedestrian overpass next to Glasgow's SECC. more>> |
 |
We Take The Stairs at The Usher Hall
Almost 100 years of constant use and new access legislation has required the hall to have a major internal refit. April 2nd 2007 saw the official start of the works to produce a refurbished and upgraded Usher Hall. more>>
|
 |
Vehicle Buffers
We produced up to 50 holes per day with our new trailer based drilling rig . more>> |
 |
| |
|
| Older |
Concrete Polishing
Two prestigious concrete polishing contracts have recently been successfully completed by CVD.
Click here for case study
The Escalator to Success
A tricky structural alteration contract within a large department store in Edinburgh.
Click here for case study
Monster Drilling at Inverness
required the demolition of a 30 metre high, 3 metre diameter lift shaft and a large part of the first floor. Click here for case study |



|