Shotblasting Overpass in Glasgow
CVD's high capacity shotblasters removed all traces of floor paint from this pedestrian overpass near Glasgows' SECC.

One pass was all that was required, with a hand turbo grinder clearing out the edges.

All dust and steel shot removed by dust extractors to enable the contractor to relay the surface that evening.

For more information on this project please contact John Carswell at CVD on 0845 450 1701.
|